PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavating at H-5 Footing Facing North (800x600).jpg Excavating at H-5 Footing Facing North -2 (800x600).jpg Building Rebar Mats for Elev. 4-Stair -2 Facing South (800x600).jpg Setting Rebar mats at Elev. 4  2nd floor Facing South (800x600).jpg Starting unbolting the shear wall panels at Elev. 1,2,3 Facing West (800x600).jpg Closing wall forms at L 3.3-5 and M 5-6 Facing North-East -2 (800x600).jpg Compacting at H-5 Footing Facing North (800x600).jpg Site fence down at Rahway Ave Facing South (800x600).jpg
Previous pageNext page Starting unbolting the shear wall panels at Elev. 1,2,3 Facing West (800x600)
Starting unbolting the shear wall panels at Elev. 1,2,3 Facing West (800x600)